Slab Flattening and other Surfacing
$200.00 – $850.00
We can surface materials up to 61" X 121" (5'1" x 10'1") with some ability to surface longer material up to 20'
Cost
- Slabs are $100/hour of machine time (most slabs take between 2-4 hours, 2 hour minimum)
- Tabletops with Epoxy are $150/hour of machine time (most take between 3-6 hours, 3 hour minimum)
- All wood glue-up flattenings are $75/hour of machine time (time varies, minimum 1 hour)
Additional information
Square Footage (L' X W') | 1sf – 10sf, 11sf – 20sf, 21sf – 30sf, 31sf – 40sf, 41sf – 50sf, 51sf – 60sf, 60sf+ |
---|---|
Material | Wood Slabs (Live Edge & Plank), Wooden Glue Ups (Tables, Cutting Boards etc.), Wood + Epoxy (River Tables, etc.) |